Look through the key statistics analysis before diving in deeper into our report:
Parameter | Current result | Assessment |
---|---|---|
Meta title | Home - The Freedoms Project | As meta title is a ranking factor, it's quite important to stick to search engine recommended length of aroun 50-60 characters. This website's meta title is 27 characters long. |
Description | The Freedoms Project: educating and alerting you to threats to our freedoms and human rights - especially the right to be born. | This meta description is 127 characters in length. Google suggests up to 320 characters at the very most to make sure the whole meta description is visible in search results page. |
Site speed | Around 1.4646 seconds | The website load speed is rather good. |
Links on homepage | Around 90 links | This is a well-judged amount of links for a homepage. |
HTML size | 60.5KB | A very good result, this. Remember, search engines such as Google place a lot of their website ratings on its speed. |
Website host server overview | Server status: online. Server IP address for this website is 198.74.52.204. | We apologize, but for some reason we were unable to gather enough data to provide a detailed insight at this time. |
If the basic information we presented you with above is not enough, get ready to dive in much deeper!
Servers are physical storage devices that contain all the files and databases associated with a specific website, sometimes more than one. At times, a server makes up several virtual devices - separate servers used for shared hosting (tends to be cheaper). Entering website address into the address bar of your browser starts the request process during which your browser contacts the server and asks for specific files and database entries in order to display the requested website.
What follows is certainly very geeky, but informative for the knowing. Dig in:
Header detail |
---|
HTTP/1.1 200 OK Date: Fri, 08 Dec 2017 06:55:34 GMT Server: Apache/2.4.18 (Ubuntu) Link: <http://thefreedomsproject.com/wp-json/>; rel="https://api.w.org/" Link: <http://wp.me/P7FLBo-C>; rel=shortlink Vary: Accept-Encoding Transfer-Encoding: chunked Content-Type: text/html; charset=UTF-8 |
Now that you are hopefully done with thefreedomsproject.com, we invite you to read more of our in-depth reports. Try entering a new domain address in the search form at the top of this page, or on the homepage. Alternatively, refer to this list for more website overviews:
We have found so many alternative TLD extensions for thefreedomsproject.com. Here is the full list with 580 entries:
The following list of most frequent domain address mistypes associated with thefreedomsproject.com contains at least 1352 entries: