Look through the key statistics analysis before diving in deeper into our report:
Parameter | Current result | Assessment |
---|---|---|
Meta title | JMS Project - Making Life Easy | As meta title is a ranking factor, it's quite important to stick to search engine recommended length of aroun 50-60 characters. This website's meta title is 30 characters long. |
Description | Making Life Easy | This meta description is 16 characters in length. Google suggests up to 320 characters at the very most to make sure the whole meta description is visible in search results page. |
<meta> keywords | Body Corporate Maintenance, Building Maintenance, Property Maintenance, Handyman Services, Building Repairs, Roof Inspections, Gutter Cleaning | Strangely enough, meta keywords still seem to be used. We would not go down that road unless very carefully - meta keywords have not been known as a positive ranking factor for a while now. |
Site speed | Around 2.1993 seconds | Website ranking and usability can be greatly improved by reducing the time it takes to load it. |
Links on homepage | Around 29 links | This is a well-judged amount of links for a homepage. |
Backlinks amount | Approximately 2 | The number of backlinks seems awfully low. If possible, the webmaster should work towards building more through quality content and public awareness. |
HTML size | 26.2KB | Ah. Well. We were hoping for better results... We would urge the website owners to improve load speed as soon as possible. |
Website host server overview | Server status: online. Server IP address for this website is 108.167.143.132. | We apologize, but for some reason we were unable to gather enough data to provide a detailed insight at this time. |
If the basic information we presented you with above is not enough, get ready to dive in much deeper!
Servers are physical storage devices that contain all the files and databases associated with a specific website, sometimes more than one. At times, a server makes up several virtual devices - separate servers used for shared hosting (tends to be cheaper). Entering website address into the address bar of your browser starts the request process during which your browser contacts the server and asks for specific files and database entries in order to display the requested website.
What follows is certainly very geeky, but informative for the knowing. Dig in:
Header detail |
---|
HTTP/1.1 200 OK Server: nginx/1.12.2 Date: Mon, 27 Nov 2017 12:17:43 GMT Content-Type: text/html; charset=UTF-8 Transfer-Encoding: chunked Connection: keep-alive Link: <http://www.jmsproject.com.au/wp-json/>; rel="https://api.w.org/" |
Now that you are hopefully done with jmsproject.com.au, we invite you to read more of our in-depth reports. Try entering a new domain address in the search form at the top of this page, or on the homepage. Alternatively, refer to this list for more website overviews:
We have found so many alternative TLD extensions for jmsproject.com.au. Here is the full list with 580 entries:
The following list of most frequent domain address mistypes associated with jmsproject.com.au contains at least 1164 entries: