Look through the key statistics analysis before diving in deeper into our report:
Parameter | Current result | Assessment |
---|---|---|
Meta title | Indonesia IPP Summit | As meta title is a ranking factor, it's quite important to stick to search engine recommended length of aroun 50-60 characters. This website's meta title is 20 characters long. |
Description | A Comprehensive Forum on Indonesia Power Generation & Electricity | This meta description is 65 characters in length. Google suggests up to 320 characters at the very most to make sure the whole meta description is visible in search results page. |
<meta> keywords | power, ipp, power generation, power expo, power conference, conference, expo, indonesia power generation, power generation, power plant, power sector, power plant indonesia, indonesia power generation, indonesia power plant, indonesia power sector, indonesia power conference, indonesia power seminar, indonesia independent power producer, indonesia power generation outlook, indonesia ipp conference, indonesia ipp outlook, indonesia ipp summit, indonesia ipp seminar, indonesia independent power producer conference, indonesia power generation electricity conference, indonesia electricity conference, indonesia gas power generation, indonesia gas power sector, indonesia coal fired power plant, indonesia coal fired power generation, indonesia lng power, indonesia lng power generation, indonesia gas power generation, indonesia gas lng power, indonesia gas conference, indonesia electricity and power generation, indonesia electricity market, indonesia electricity and ipp conference, indonesia electricity and ipp market, indonesia electricity and power generation prospect, indonesia power generation scheme, indonesia power generation and IPP scheme indonesia lng power conference, power generation in Indonesia, power sector in Indonesia, power plant business in Indonesia, lng power in indonesia, coal power in Indonesia, gas power in Indonesia, power generation business in Indonesia, IPP business in Indonesia IPP conference, Asian power generation, news lng indonesia, SKK Migas: No need for LNG import yet Upstream authority SKK Migas said that the country is unlikely to import LNG within the next couple of years despite recent new regulation allowing the import of LNG for power plants. Bisnis Indonesia quoted upstream oil and authority SKK Migas Spokesman Taslim Z. Yunus as saying Friday that gas production from existing fields at home are still sufficient to meet demands from power plants and manufacturing industries. He added that domestic gas infrastructure facilities such as storage and regasification facilities are still limited to allow for LNG import. He pointed out that currently there are only four of such facilities in the country including one in Benoa, Bali, with capacity of 50 mmscfd (owned by PT Pembangkitan Jawa Bali), in Lampung owned by PT PGN Tbk with capacity of 240 mmscfd, in Arun, Aceh, owned by PT Pertamina, and another one in West Java, with capacity of 400 mmscfd owned by PT Nusantara Regas. “Until 2019, it is not the time yet to make import (of LNG). In terms of regasification, it is still limited. So if in the near term there’s no increase in regasification capacity, import can’t be made,” he said. Taslim added that to date there are 28 LNG cargoes from Bontang LNG plant in East Kalimantan that have not been absorbed yet, and another 4 cargoes of LNG from Tangguh plant in West Papua. He also said that plans of development of a number of gas field projects such as Kasuri field in Papua has yet to be approved because the project has yet to obtain buyers. The project is targeted to produce 235 bbtud of gas in 2019. Minister of Energy and Mineral Resources Ignasius Jonan said last month he has signed a new regulation allowing the import of LNG by state-owned electricity firm PT PLN and independent power producers. The power producers are expected to be able to get cheaper gas through import of cheap LNG particularly from the Middle East. news indonesia power generation State-owned PT Geodipa Energi has proposed to the government to develop five additional geothermal working areas with potential to produce combined power capacity of 305 MW. Geodipa President Director Riki F. Ibrahim said to Petromindo.com on Thursday the five geothermal working areas are Gunung Gede Pangrango, in West Java (potential power capacity 55 MW), Ciremai, West Java (110 MW), Gunung Endut, Banten (40 MW), Bonjol, West Sumatra (60 MW) and Dananu Ranau, South Sumatra (40 MW). | Strangely enough, meta keywords still seem to be used. We would not go down that road unless very carefully - meta keywords have not been known as a positive ranking factor for a while now. |
Site speed | Around 3.431 seconds | Website ranking and usability can be greatly improved by reducing the time it takes to load it. |
Links on homepage | Around 23 links | This is a well-judged amount of links for a homepage. |
Backlinks amount | Approximately 6 | The number of backlinks seems awfully low. If possible, the webmaster should work towards building more through quality content and public awareness. |
HTML size | 46.7KB | Ah. Well. We were hoping for better results... We would urge the website owners to improve load speed as soon as possible. |
Website host server overview | Server status: online. Server IP address for this website is 103.241.24.179. | We apologize, but for some reason we were unable to gather enough data to provide a detailed insight at this time. |
If the basic information we presented you with above is not enough, get ready to dive in much deeper!
Now that the numbers are taken care of, we can go deeper and try to analyse the website from a user's perspective. More specifically, let's see if we can identify the target audience as well as a few related websites and categories.
Parameter | Current result | Assessment |
---|---|---|
Alternative websites | indopowergenippexpo.com indonesiapowerconference.com ippfpowerasia.com repit.wordpress.com petromindo.com |
These websites fall into the same categories as indonesiaippsummit.com, more or less. By extension, they compete with the analysed website for the same target audience. |
Servers are physical storage devices that contain all the files and databases associated with a specific website, sometimes more than one. At times, a server makes up several virtual devices - separate servers used for shared hosting (tends to be cheaper). Entering website address into the address bar of your browser starts the request process during which your browser contacts the server and asks for specific files and database entries in order to display the requested website.
What follows is certainly very geeky, but informative for the knowing. Dig in:
Header detail |
---|
HTTP/1.1 200 OK Date: Sat, 16 Dec 2017 10:38:50 GMT Server: Apache X-Powered-By: PHP/5.6.32 Link: <https://indonesiaippsummit.com/wp-json/>; rel="https://api.w.org/" Transfer-Encoding: chunked Content-Type: text/html; charset=UTF-8 |
Now that you are hopefully done with indonesiaippsummit.com, we invite you to read more of our in-depth reports. Try entering a new domain address in the search form at the top of this page, or on the homepage. Alternatively, refer to this list for more website overviews:
We have found so many alternative TLD extensions for indonesiaippsummit.com. Here is the full list with 580 entries:
The following list of most frequent domain address mistypes associated with indonesiaippsummit.com contains at least 1376 entries: